.

TMM bridgelayer

BACK NEXT

    TMM bridgelayer

    pavement design TMM consists of four sections,

    installed at the back of the truck KrAZ-214 or

    KrAZ-255B

    wheel circuit 6x6. Each of the sections lying

    Vertically

    minutes cables held until it reaches the final

    Regulations, which lays on special supports. Then

    Truck detached from the bridge and pulls to install

    next design. Base bridge has a length of about 40 m, but

    If necessary, these bridges can be joined, increasing the total

    length. The installation of such a structure takes 45-60 minutes.

    The only drawback is the need

    Use

    support - if the depth of the ravine or river exceeds

    bearing length, the bridge can not be set. TMM system very

    simple to manufacture and operate, if necessary, may be

    churns.

    Production:

    Crew:

    USSR

    3

    weight:

    19,5 ton

    Dimensions:

    length of 9 m (the bridge), the width of 3 m (the bridge), height 3 (bridge)

    Range:

    530 km

    Armor:

    No

    Armament:

    No

    Engine

    :

    One 6-cylinder diesel engine cooling water

    Ride quality:

    JAMZ M206B 205 l capacity. with.

    : max road speed of 55 km / h, 1.0 m fording,

    Fording 0.4 m wall, overcoming moats not

    assumed





BACK NEXT TOP

Site is a private collection of materials and is an amateur informational and educational resource. All information is obtained from public sources. The administration does not apply for authorship of the materials used. All rights belong to their owners